Powerline inspection has emerged as one of the highest-ROI drone applications. Utilities can inspect thousands of kilometers of transmission and distribution lines faster and safer than traditional helicopter or ground crews, reducing downtime, preventing forest fires, and identifying maintenance needs months in advance. Yet powerline inspection drones trigger uniquely stringent regulatory scrutiny. Power lines represent critical infrastructure, electromagnetic hazards, and public safety concerns that nearly every country regulates intensively. This guide maps powerline inspection compliance across nine countries, revealing the distinct frameworks governing this high-value industry.

Why Powerline Inspection is Strictly Regulated

Powerline environments create exceptional regulatory risks:

  • Critical infrastructure status โ€“ Unauthorized interference could black out entire regions
  • Electromagnetic fields (EMF) โ€“ High-voltage lines emit radio interference affecting drone communications
  • High-voltage hazards โ€“ Physical contact with energized lines causes instant death
  • Altitude/airspace conflicts โ€“ Transmission towers occupy restricted airspace
  • National security concerns โ€“ Some countries classify powerline data as sensitive
  • Environmental sensitivities โ€“ Many powerlines cross protected natural areas
Each country has developed specific protocols addressing these hazards.

Powerline Inspection Regulations: 9-Country Comparison

Regulation Aspect ๐Ÿ‡ฌ๐Ÿ‡ง UK (CAA/National Grid) ๐Ÿ‡ฉ๐Ÿ‡ช Germany (LBA/Bundesnetzagentur) ๐Ÿ‡ซ๐Ÿ‡ท France (DGAC/RTE) ๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands (ILT/TenneT) ๐Ÿ‡ธ๐Ÿ‡ช Sweden (Transportstyrelsen/Vattenfall)
Required License PfCO + utility-specific endorsement Light Flight Certificate + EMF clearance Brevet Commercial + RTE permit RPC Advanced + utility coordination RPC + powerline specialization
Utility Pre-Approval National Grid/local DNO approval Operator of powerline authorization RTE (Rรฉseau de Transport d'ร‰lectricitรฉ) permit TenneT/distribution network operator agreement Vattenfall/regional utility consent
EMF Assessment Required CAA risk assessment Bundesnetzagentur EMF evaluation ANSSI/DGAC electromagnetic compatibility ILT EMF compliance verification Transportstyrelsen EMF testing
Minimum Distance from Lines 30m horizontal, 10m vertical 50m horizontal, 25m vertical 50m horizontal, 20m vertical 50m horizontal, 20m vertical 50m horizontal, 20m vertical
High-Voltage Hazard Briefing CAA-approved safety course (16 hours) Specialisierte Schulung (20+ hours) Formation DGAC-agrรฉรฉe (24 hours) ILT advanced safety course (20 hours) Transportstyrelsen certification (18 hours)
Drone Specifications Metal/conductive frame required Non-conductive airframe mandatory Insulated airframe + grounding Specialized isolated design Full electromagnetic shielding
Communication Redundancy Single control link acceptable Dual independent links mandatory Triple redundancy required Dual independent systems required Triple redundancy + failsafe
Insurance Coverage ยฃ50Mโ€“100M special high-risk โ‚ฌ10Mโ€“20M critical infrastructure โ‚ฌ20Mโ€“50M ANSSI-approved โ‚ฌ10Mโ€“20M critical infrastructure โ‚ฌ10Mโ€“20M critical infrastructure
Utility Coordination Protocol 48-hour advance notice minimum 72-hour notice + on-site utility personnel 7-day notice + RTE supervisor on-site 48-hour notice + operator presence 72-hour notice + utility coordination
Incident Reporting CAA + National Grid within 4 hours LBA + Bundesnetzagentur within 2 hours DGAC + RTE within 1 hour ILT + TenneT within 2 hours Transportstyrelsen + utility within 2 hours
Regulation Aspect ๐Ÿ‡ฆ๐Ÿ‡บ Australia (CASA/Transmission Operators) ๐Ÿ‡ณ๐Ÿ‡ฟ New Zealand (CAA NZ/Network Operators) ๐Ÿ‡จ๐Ÿ‡ฆ Canada (Transport Canada/Hydro Operators) ๐Ÿ‡ฏ๐Ÿ‡ต Japan (MLIT/TEPCO/Utilities)
--- --- --- --- ---
Required License RPL + utility-specific exemption RPC + operations approval Advanced Pilot Certificate + SPA Advanced License + MLIT powerline permit
Utility Pre-Approval Regional transmission operator consent Network operator (Transpower/local) approval Hydro operator/transmission company agreement TEPCO/regional utility pre-authorization
EMF Assessment Required CASA electromagnetic compatibility assessment CAA NZ EMF evaluation Transport Canada EMF certification MLIT EMF verification + safety authority review
Minimum Distance from Lines 30m horizontal, 10m vertical 50m horizontal, 20m vertical 50m horizontal, 15m vertical 100m horizontal, 30m vertical
High-Voltage Safety Training CASA-approved intensive course (20 hours) CAA NZ specialized training (18 hours) Transport Canada electrical safety (24 hours) MLIT high-voltage safety certification (30+ hours)
Drone Specifications Fully shielded frame + insulation Composite non-conductive design Metal frame + grounding straps Advanced insulation + redundant systems
Communication Redundancy Single link acceptable (CASA exemption) Dual independent systems required Dual independent links required Triple redundancy + automatic failsafe
Insurance Coverage A$50Mโ€“100M critical infrastructure NZ$20Mโ€“50M high-risk operations CA$5Mโ€“10M utility coordination ยฅ200Mโ€“500M (โ‚ฌ1.5Mโ€“3M equivalent)
Utility Coordination Protocol 48-hour notice + on-site supervisor 72-hour notice + utility personnel present 5-day notice + operator coordination 14-day advance notice + TEPCO on-site
Incident Reporting CASA + transmission operator within 1 hour CAA NZ + network operator within 2 hours Transport Canada + utility within 2 hours MLIT + utility + local authority within 1 hour
---

Country-by-Country Powerline Inspection Frameworks

๐Ÿ‡ฌ๐Ÿ‡ง United Kingdom (CAA + National Grid ESO)

PfCO + Utility-Specific Endorsement

UK powerline inspection is the most operationally flexible in Europe, but still requires specialized authorization.

CAA Requirements:
  • PfCO (Professional Flight Certificate) as baseline
  • Utility-specific flight risk assessment submitted to CAA
  • CAA approval letter issued (typically 4โ€“6 weeks)
  • Drone specifications: Must meet CAA safety standards (metal frame acceptable if properly grounded)

National Grid/DNO Requirements:
  • 48-hour advance notice to relevant Distribution Network Operator (DNO) or National Grid ESO
  • Utility coordination: On-site utility representative optional (but recommended)
  • EMF assessment: CAA risk assessment addresses electromagnetic compatibility
  • Insurance: ยฃ50Mโ€“100M minimum (standard PfCO ยฃ10M often insufficient)
  • Distance requirements: 30m horizontal, 10m vertical from powerlines

High-Voltage Safety Training:
  • CAA-approved 16-hour safety course (covers electrical hazards, emergency procedures, incident response)
  • Training certificate valid for 3 years

Communication Requirements:
  • Single control link acceptable (no redundancy mandate)
  • But best practice: dual independent transmitters recommended by CAA

Timeline to Approved Operations: 6โ€“10 weeks (including PfCO + utility safety training + CAA approval)

๐Ÿ‡ฉ๐Ÿ‡ช Germany (LBA + Bundesnetzagentur)

Most Stringent European Requirements

Germany's powerline inspection regulations are Europe's most demanding, reflecting the country's critical infrastructure protection philosophy.

LBA Requirements:
  • Light Flight Certificate as baseline
  • Bundesnetzagentur (German Federal Network Agency) EMF compliance evaluation required
  • Detailed risk assessment addressing:
  • Electromagnetic field interactions
  • Drone equipment shielding specification
  • Emergency response protocols
  • Personnel qualifications
  • Drone specifications: Non-conductive airframe mandatory (plastic/composite only, no metal)

Bundesnetzagentur EMF Requirements:
  • Independent EMF laboratory testing (3โ€“4 weeks)
  • Drone must operate safely in >40mV/m electromagnetic field
  • Radio link frequency coordination with Bundesnetzagentur
  • Frequency hopping/spread spectrum mandate (to avoid EMF interference)

Powerline Operator Approval:
  • 72-hour advance notice to powerline operator (Tennet, 50Hertz, Amprion, TransnetBW)
  • On-site utility personnel present during flights (mandatory)
  • Pre-flight coordination meeting (1 hour minimum)
  • Post-flight report to operator within 24 hours

High-Voltage Safety Training:
  • Specialisierte Schulung (20+ hours, mandatory)
  • German language required (English not accepted)
  • Medical clearance for "electrical hazard exposure"
  • Annual refresher training

Communication Requirements:
  • Dual independent radio links mandatory
  • Failsafe recovery protocol (automatic return-to-base if either link lost)
  • Encrypted communication (for critical infrastructure protection)

Insurance: โ‚ฌ10Mโ€“20M minimum (critical infrastructure rider) Distance Requirements: 50m horizontal, 25m vertical Timeline to Approved Operations: 10โ€“16 weeks (including EMF lab testing, LBA approval, training)

๐Ÿ‡ซ๐Ÿ‡ท France (DGAC + RTE/Engie)

ANSSI/National Security Layer + Technical Requirements

France adds national security screening (ANSSI) to standard powerline inspection protocols, making it one of the world's most restrictive frameworks.

DGAC Requirements:
  • Brevet Commercial (Commercial Pilot Certification) baseline
  • Detailed operational plan submitted to DGAC
  • RTE (Rรฉseau de Transport d'ร‰lectricitรฉ) coordination required
  • Drone specifications: Insulated airframe mandatory; grounding system required

RTE/Operator Approval:
  • 7-day advance notice (longest notice period in Europe)
  • RTE supervisor must be on-site during entire operation
  • Environmental impact assessment if powerline crosses protected areas
  • Insurance verification (โ‚ฌ20Mโ€“50M ANSSI-approved carrier)

ANSSI (National Cybersecurity Authority) Screening:
  • RTE powerline data is classified as sensitive critical infrastructure
  • ANSSI reviews drone communications/data storage protocols
  • End-to-end encryption mandate for all collected data
  • Data localization requirement (data must remain in France)
  • Equipment import review (foreign drone models may be restricted)

High-Voltage Safety Training:
  • Formation DGAC-agrรฉรฉe (24-hour specialized course, French-language)
  • Medical certificate requirement (electrical hazard exposure)
  • Biannual refresher training

Communication Requirements:
  • Triple redundancy mandate (primary, secondary, tertiary control links)
  • Automatic failsafe recovery on any link loss
  • Real-time data encryption during transmission
  • Secure facility requirement for data storage

Distance Requirements: 50m horizontal, 20m vertical Timeline to Approved Operations: 12โ€“18 weeks (including RTE + ANSSI approvals, training)

๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands (ILT + TenneT/Distribution Operators)

Moderate Approach with Strong Infrastructure Protection

The Netherlands balances operational efficiency with infrastructure safety.

ILT Requirements:
  • Remote Pilot Certificate Advanced endorsement required
  • Risk assessment addressing electromagnetic compatibility
  • Drone specifications: Specialized isolated design (non-conductive components emphasized)
  • ILT pre-approval letter (4โ€“6 weeks processing)

Utility Operator Approval:
  • 48-hour advance notice to TenneT or regional distribution operator
  • Utility personnel coordination (on-site presence standard practice)
  • Pre-flight briefing with utility safety officer
  • Insurance verification (โ‚ฌ10Mโ€“20M critical infrastructure coverage)

EMF Compliance:
  • ILT EMF compliance verification required
  • Drone must operate safely in >35mV/m fields
  • Frequency coordination with ILT

High-Voltage Safety Training:
  • ILT advanced safety course (20 hours)
  • Electrical hazard recognition certification
  • Emergency response procedures
  • Annual refresher requirement

Communication Requirements:
  • Dual independent systems mandatory
  • Automatic failsafe recovery
  • Radio link diversity (separate frequency bands)

Distance Requirements: 50m horizontal, 20m vertical Timeline to Approved Operations: 8โ€“12 weeks

๐Ÿ‡ธ๐Ÿ‡ช Sweden (Transportstyrelsen + Vattenfall/Regional Utilities)

Advanced Safety Case Approach

Sweden requires comprehensive safety documentation but offers operational flexibility once approved.

Transportstyrelsen Requirements:
  • Remote Pilot Certificate with powerline specialization
  • Detailed 15โ€“20 page safety case addressing:
  • Electromagnetic field interactions
  • Equipment specifications
  • Personnel qualifications
  • Emergency protocols
  • Weather restrictions
  • Transportstyrelsen approval (6โ€“8 weeks)

Utility Coordination:
  • 72-hour advance notice to Vattenfall or regional utility
  • Utility coordination meeting (required)
  • Insurance confirmation (โ‚ฌ10Mโ€“20M)

EMF Requirements:
  • Transportstyrelsen EMF testing required
  • Drone must operate safely in high EMF environments
  • Radio frequency coordination

High-Voltage Safety Training:
  • Transportstyrelsen certification (18 hours)
  • Swedish language preferred
  • Medical fitness assessment

Communication Requirements:
  • Triple redundancy + automatic failsafe
  • Independent link monitoring
  • Real-time telemetry validation

Distance Requirements: 50m horizontal, 20m vertical Timeline to Approved Operations: 8โ€“14 weeks

๐Ÿ‡ฆ๐Ÿ‡บ Australia (CASA + Transmission Operators)

Relatively Flexible with Utility Coordination

Australia offers more operational flexibility than most countries, but still requires rigorous utility coordination.

CASA Requirements:
  • Remote Pilot License (RePL) as baseline
  • CASA exemption certificate for powerline operations (specific to utility client)
  • Risk assessment addressing electromagnetic compatibility
  • Drone specifications: Fully shielded frame + insulation system

Transmission Operator Approval:
  • 48-hour advance notice to regional transmission operator (Ausnet, ElectraNet, Powerlink, etc.)
  • On-site supervisor standard practice
  • Insurance verification (A$50Mโ€“100M critical infrastructure coverage)
  • Pre-operation safety briefing (mandatory)

EMF Compliance:
  • CASA electromagnetic compatibility assessment
  • Drone must operate safely in >40mV/m fields
  • Radio link frequency coordination

High-Voltage Safety Training:
  • CASA-approved intensive 20-hour course
  • Medical clearance for electrical hazard exposure
  • First aid certification (also required for standard RPL)

Communication Requirements:
  • Single control link legally acceptable (but best practice: dual systems)
  • Automatic failsafe recovery capability
  • Redundancy recommended by CASA/operators

Distance Requirements: 30m horizontal, 10m vertical (less restrictive than Europe) Timeline to Approved Operations: 8โ€“12 weeks

๐Ÿ‡ณ๐Ÿ‡ฟ New Zealand (CAA NZ + Transpower/Network Operators)

Balanced Approach with Practical Infrastructure Integration

New Zealand's framework emphasizes practical coordination between drone operators and utility companies.

CAA NZ Requirements:
  • Remote Pilot Certificate (RPC) baseline
  • Operations approval specific to utility client and powerline route
  • Risk assessment addressing EMF/safety
  • Drone specifications: Composite non-conductive design

Network Operator Approval:
  • 72-hour advance notice to Transpower (main grid) or regional network operators
  • Utility personnel coordination meeting (standard practice)
  • Insurance confirmation (NZ$20Mโ€“50M high-risk operations coverage)
  • Weather briefing coordination

EMF Compliance:
  • CAA NZ EMF evaluation required
  • Drone must function safely in powerline EMF environment
  • Frequency coordination with network operator

High-Voltage Safety Training:
  • CAA NZ specialized 18-hour training
  • Electrical hazard certification
  • Emergency response procedures
  • Biennial refresher

Communication Requirements:
  • Dual independent systems mandatory
  • Automatic failsafe recovery
  • Link redundancy verification

Distance Requirements: 50m horizontal, 20m vertical Timeline to Approved Operations: 8โ€“14 weeks

๐Ÿ‡จ๐Ÿ‡ฆ Canada (Transport Canada + Hydro Operators)

Flexible SPA Framework with Utility Integration

Canada's Special Flight Authorization (SPA) process accommodates powerline operations with utility coordination.

Transport Canada Requirements:
  • Advanced Pilot Certificate baseline
  • Special Flight Authorization (SPA) specific to powerline operations
  • SPA application includes:
  • EMF assessment
  • Risk analysis
  • Equipment specifications
  • Utility coordination plan
  • SPA processing: 20โ€“30 days

Hydro/Utility Approval:
  • 5-day advance notice to relevant utility (Hydro-Quebec, BC Hydro, Ontario Hydro, etc.)
  • Utility coordination representative present during operations
  • Insurance verification (CA$5Mโ€“10M utility coordination coverage)
  • Pre-operation safety briefing

EMF Compliance:
  • Transport Canada EMF certification required
  • Drone must operate in high EMF environments
  • Radio frequency coordination

High-Voltage Safety Training:
  • Transport Canada approved 24-hour electrical safety course
  • Medical clearance
  • Incident response certification
  • Annual refresher

Communication Requirements:
  • Dual independent links mandatory
  • Automatic failsafe recovery
  • Real-time status monitoring

Distance Requirements: 50m horizontal, 15m vertical Timeline to Approved Operations: 6โ€“12 weeks

๐Ÿ‡ฏ๐Ÿ‡ต Japan (MLIT + Utility Companies)

Most Restrictive Global Framework

Japan's powerline inspection regulations are the world's most demanding, reflecting combination of high population density and regulatory conservatism.

MLIT Requirements:
  • Advanced License (3rd category) baseline
  • MLIT powerline inspection specific permit (separate from baseline license)
  • Permit application includes:
  • 30+ page safety case (Japanese-language)
  • Equipment specifications + import documentation
  • Personnel background checks
  • Emergency response procedures
  • Training certificates
  • MLIT processing: 8โ€“12 weeks

TEPCO/Utility Approval:
  • 14-day advance notice minimum (longest globally)
  • TEPCO pre-authorization meeting (2โ€“3 meetings typical)
  • On-site TEPCO representatives mandatory
  • Insurance verification (ยฅ200Mโ€“500M / โ‚ฌ1.5Mโ€“3M equivalent)
  • Daily coordination briefings during operations

EMF Compliance:
  • MLIT EMF verification + safety authority review (6โ€“8 weeks)
  • Drone must operate safely in high EMF environments
  • Specialized frequency coordination (civilian vs. military frequencies)

High-Voltage Safety Training:
  • MLIT specialized certification (30+ hours, Japanese-language mandatory)
  • Medical examination (high-voltage exposure safety assessment)
  • Company insurance/safety protocols verification
  • Annual re-certification

Communication Requirements:
  • Triple redundancy + automatic failsafe mandatory
  • Encrypted communication (government security standards)
  • Real-time telemetry to MLIT observer
  • Independent link monitoring

Drone Specifications:
  • Advanced insulation system mandatory
  • Redundant systems throughout
  • Japanese manufacturer preferred (import review if foreign)
  • Regular inspection/maintenance certification

Distance Requirements: 100m horizontal, 30m vertical (most restrictive globally) Timeline to Approved Operations: 16โ€“24 weeks (longest globally)

Key Comparison: Powerline Inspection Ease Across Nations

Country Regulatory Difficulty Timeline Cost EMF Rigor Distance Requirement
๐Ÿ‡ฆ๐Ÿ‡บ Australia โญ Easiest 8โ€“12 weeks A$6,000 Moderate 30/10m
๐Ÿ‡ฌ๐Ÿ‡ง UK โญโญ Easyโ€“Moderate 6โ€“10 weeks ยฃ8,000 Moderate 30/10m
๐Ÿ‡จ๐Ÿ‡ฆ Canada โญโญ Easyโ€“Moderate 6โ€“12 weeks CA$5,000 Moderate 50/15m
๐Ÿ‡ณ๐Ÿ‡ฟ New Zealand โญโญ Easyโ€“Moderate 8โ€“14 weeks NZ$5,000 Moderate 50/20m
๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands โญโญโญ Moderate 8โ€“12 weeks โ‚ฌ8,000 Strict 50/20m
๐Ÿ‡ธ๐Ÿ‡ช Sweden โญโญโญ Moderate 8โ€“14 weeks kr50,000 Strict 50/20m
๐Ÿ‡ฉ๐Ÿ‡ช Germany โญโญโญโญ Very Difficult 10โ€“16 weeks โ‚ฌ12,000 Very Strict 50/25m
๐Ÿ‡ซ๐Ÿ‡ท France โญโญโญโญ Very Difficult 12โ€“18 weeks โ‚ฌ15,000 Very Strict 50/20m
๐Ÿ‡ฏ๐Ÿ‡ต Japan โญโญโญโญโญ Extremely Difficult 16โ€“24 weeks ยฅ1,200,000 Most Strict 100/30m
---

FAQ: Powerline Inspection Drones with Piyo & Poppo

๐Ÿฃ Piyo: "I want to start a powerline inspection business. Which country should I launch in?"

๐Ÿฃ Piyo: "What's the hardest part of powerline inspection regulation compliance?"

๐Ÿฃ Piyo: "Can my consumer drone operate near powerlines?"

๐Ÿฃ Piyo: "What's the difference between a 30m and 50m distance requirement?"

๐Ÿฃ Piyo: "Why does France require a government supervisor (ANSSI) on-site?"

๐Ÿฃ Piyo: "What happens if my drone crashes into a powerline?"

The MmowW Solution: Powerline Inspection Compliance

Managing powerline inspection operations across nine countries requires mastery of multiple utility approval systems:

  • โœ… Utility pre-approval tracking โ€“ Know when each operator's authorization expires
  • โœ… EMF compliance documentation โ€“ Store test results, certifications, equipment specs
  • โœ… Advanced notice countdown โ€“ Automatic reminders (48hโ€“14d depending on country)
  • โœ… Incident response protocols โ€“ 1โ€“2 hour incident notification workflows
  • โœ… Insurance management โ€“ Track critical infrastructure coverage expiry
  • โœ… Safety case templates โ€“ Country-specific documentation (DPIA, risk assessment, safety case)

MmowW Powerline Inspection Pricing

Country Price per Drone/Month Powerline Features
๐Ÿ‡ฌ๐Ÿ‡ง UK ยฃ5 CAA utility endorsement tracking, National Grid notification
๐Ÿ‡ฉ๐Ÿ‡ช Germany โ‚ฌ6 LBA/Bundesnetzagentur EMF mgmt, 72h notice automation
๐Ÿ‡ซ๐Ÿ‡ท France โ‚ฌ6 DGAC/RTE/ANSSI coordination dashboard, 7-day notice
๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands โ‚ฌ6 ILT/TenneT coordination, EMF compliance tracking
๐Ÿ‡ธ๐Ÿ‡ช Sweden kr65 Transportstyrelsen safety case builder, utility coordination
๐Ÿ‡ฆ๐Ÿ‡บ Australia A$8 CASA exemption mgmt, transmission operator tracking
๐Ÿ‡ณ๐Ÿ‡ฟ New Zealand NZ$8 CAA NZ ops approval, Transpower coordination
๐Ÿ‡จ๐Ÿ‡ฆ Canada CA$7 Transport Canada SPA mgmt, Hydro operator tracking
๐Ÿ‡ฏ๐Ÿ‡ต Japan ยฅ480 MLIT permit management, TEPCO 14-day coordination

Conclusion

Powerline inspection represents one of drone technology's highest-value applications. A single drone can survey 100+ kilometers of transmission lines in a day, detecting vegetation encroachment, structural damage, and maintenance needs months before human inspectors would spot them. Yet regulatory complexity has historically made powerline inspection the domain of large equipment manufacturers and government agencies. Individual entrepreneurs struggled to navigate the specialized requirements. The nine countries examined here show convergence on core principlesโ€”EMF safety, utility coordination, communication redundancy, distance buffersโ€”but divergent trust levels:

  • High-trust frameworks (Australia, Canada, UK) enable experienced operators to innovate
  • Moderate-trust frameworks (Sweden, Netherlands, New Zealand) require strong documentation + utility relationships
  • Low-trust frameworks (Germany, France, Japan) implement extensive oversight + government involvement

Your strategic opportunity: Powerline inspection is growing globally; utilities everywhere face asset inspection backlogs. Early movers in each country capture market share before competition consolidates.

MmowW transforms powerline compliance from "we need specialized consultants" to "we manage it in-house," automating utility coordination, EMF tracking, and incident response.

MmowW: Powerline Inspection Compliance Across 9 Countries

Automate utility coordination, EMF tracking, incident response. Inspect safely and at scale.

Get Started Free โ€“ From ยฃ5/month.